Incorruptible Report CN中文CN中文
The progress of the project is in full swing, and the sound of "home" comes on schedule
 时间:2020-06-13 | 浏览:639 次 | 作者:

Experienced the test of cold winter epidemic

Now the spring is bright and beautiful, as scheduled

All the efforts and sweat

Just to outline your home

A family letter full of "missing"

Send it to you

Overall construction drawing of the project

The progress of the project is in full swing, and the sound of "home" comes on schedule

Real view of the project gate

 The progress of the project is in full swing, and the sound of

Overlooking the whole project from a high place

 The progress of the project is in full swing, and the sound of

Looking at the whole project from Sufeng Road

The progress of the project is in full swing, and the sound of  

Looking at the whole project from Chengnan Road

Landscape construction drawing

 The progress of the project is in full swing, and the sound of

1-9 building center landscape construction

 The progress of the project is in full swing, and the sound of

In the construction of the base at the bottom of the central landscape pavilion

Building construction drawing

The progress of the project is in full swing, and the sound of  

1 building

1 × building has been capped, masonry has been completed, external wall painting has been completed, and gradually falling into the frame.

The progress of the project is in full swing, and the sound of  

The second floor

2 × building has been capped, masonry has been completed, external wall painting has been completed, and gradually falling into the frame.

 The progress of the project is in full swing, and the sound of

Third floor

3 × building has been capped, 2-13 layers of masonry have been completed, and the secondary structure is gradually followed up.

 The progress of the project is in full swing, and the sound of

Fifth floor

5 × building has been capped, masonry has been completed, external wall painting has been completed, and gradually falling into the frame.

 The progress of the project is in full swing, and the sound of

Six buildings

6 ා building has been capped. In masonry construction, the second floor is hardbound model room, and the civil part is gradually improving.

The progress of the project is in full swing, and the sound of  

The seventh floor

7 building has been capped, masonry has been constructed to 15 floors, and secondary structure is gradually followed up.

The progress of the project is in full swing, and the sound of  

Building 8

beam and slab formwork installation on 11th floor of Building 8

The progress of the project is in full swing, and the sound of  

The ninth floor

reinforcement construction of wall column on 11th floor of Building 9

 The progress of the project is in full swing, and the sound of

10 floors

during the construction of beam slab formwork on the 4th floor of building 10, the scaffold is being erected.

The progress of the project is in full swing, and the sound of  

11th floor

in the binding construction of beam slab reinforcement on the 4th floor of building 11

Coming of late spring and summer

All the waiting will be worth it

All expectations will not pass


Follow us: WeChat micro-blog share

Copyright All rights reserved technical support: Jinnuo Technology     闽ICP备20010631号-1